Contract Manufacturing in Massachusetts

ASA Auburn builds metal parts and assemblies to OEM drawings, supplies the material and keeps finished parts flowing with JIT delivery and managed inventory.

ASA Auburn 27 Elm Street, Auburn, MA 01501

On this page
  1. What an Auburn contract manufacturing program covers
  2. Starting a program: quote, review and first article
  3. Managed inventory and JIT delivery from Auburn
  4. Quality system and documentation
  5. Scaling with ASA’s other facilities
  6. Starting a contract manufacturing program with ASA

ASA Auburn provides contract metal manufacturing for OEMs in Massachusetts and the rest of Central New England. It builds sheet metal parts, welded assemblies and powder coated components to the customer’s drawings, supplies the raw material from its own stock, and delivers finished parts on a just-in-time or managed inventory schedule.

The OEM keeps the design and the customer; ASA takes on material, production and replenishment. Auburn has worked with manufacturers in this territory since 1978. This page explains how a contract manufacturing program at Auburn is put together, from the first quote to recurring releases.

What an Auburn contract manufacturing program covers

A program bundles several services that an OEM would otherwise buy from separate vendors. The table shows the pieces and who handles them.

Program elementWhat ASA provides
Raw materialSheet, plate, bar and tube from ASA stock, bought at service center volumes
FabricationLaser punching, forming and welding to the current drawing revision
FinishingBlasting and powder coating at the same facility
Quality recordsMill certifications, full material traceability and an ISO 9001:2015 quality system
InventoryInventory management, vendor managed inventory (VMI), kitting and kanban
DeliveryJIT delivery on ASA trucks, with most orders delivered in 24 to 48 hours

If you are weighing whether to outsource at all, what is contract manufacturing explains the model and its tradeoffs.

Starting a program: quote, review and first article

New programs at Auburn usually move through four stages before regular releases begin:

  1. Quote package. You send drawings, models, revision levels, material and finish specifications and forecast volumes.
  2. Manufacturability review. ASA checks the design against its punching, forming, welding and coating processes and suggests changes that reduce cost or risk, which you approve or decline.
  3. First article. Initial parts are built and inspected against the drawing so you can approve them before production quantities are released.
  4. Release plan. A blanket order or forecast sets the quantities and dates, and the inventory model is agreed.

Prototype quantities can run on the same equipment that will build production, so the first article reflects how the part will actually be made.

Managed inventory and JIT delivery from Auburn

Many OEMs care as much about when parts arrive as about the parts themselves. The inventory programs available through Auburn are built around that. With vendor managed inventory, ASA tracks stock against your usage and replenishes it without a new purchase order each time. With kanban, an empty bin or card at your plant triggers the next build. Kitting groups parts into sets so an assembly station receives everything it needs at once.

Paired with JIT delivery, these programs let you carry less inventory on your own floor while protecting the line from shortages. See just-in-time metal delivery for how schedules and safety stock are typically set.

Setting up a program starts with your usage history or forecast, the list of parts or materials to include, and the minimum and maximum quantities you want held. Those levels are reviewed as demand changes, so stock follows your build rate instead of a one-time estimate.

Quality system and documentation

Auburn, the first ASA site to put an ISO 9001 system in place, is certified to ISO 9001:2015. Mill certifications and full material traceability tie each part back to its source material, and ASA can supply RoHS and DFARS documentation where a contract requires it. In any contract program, agree up front how drawing revisions are released, so later builds follow the current design and any stock made to an old revision can be identified. More detail is on the quality page.

Scaling with ASA’s other facilities

Programs often grow beyond sheet metal. When an OEM adds plate parts or heavier formed components, the program can draw on ASA’s Liverpool, New York location, which runs press brakes up to 385 tons, plasma and oxy-fuel plate cutting and robotic weld cells. In Maine, South Portland laser cuts sheet and tube, Saco takes on heavy plate and West Bath handles structural tees and beams. The OEM keeps one supplier relationship while the work runs where the equipment fits it best.

Starting a contract manufacturing program with ASA

ASA has operated for more than two centuries and runs metals distribution, processing and fabrication under one company across five Northeast locations. Read about ASA’s industrial equipment and OEM contract manufacturing and value-added services, or send your drawings through the request a quote form.

Frequently asked questions

Which OEM parts are a good fit for contract manufacturing at Auburn?

Repeat sheet metal parts and welded assemblies with a stable design and forecastable demand fit best, especially when they also need blasting and powder coating, because one program can cover material, fabrication, finishing and delivery. Parts that are still changing can start as prototypes and move into scheduled releases once the design settles, and plate work can draw on ASA's other facilities.

How does vendor managed inventory work with ASA Auburn?

Under vendor managed inventory, you share usage or forecast data and ASA takes responsibility for keeping an agreed amount of your parts or material in stock. ASA monitors levels and replenishes them, so your team does not issue a purchase order for every release. The program is usually paired with just-in-time delivery and a blanket order that sets pricing.

How do I start a contract manufacturing program in Massachusetts with ASA?

Begin with a quote request through ASA's website or a call to 1-800-933-7833. Share drawings and models with revision levels, material and finish specifications and your expected annual volumes and release sizes. ASA reviews the design for manufacturability, quotes the program, and builds first article parts for your approval before production releases start.

Can ASA Auburn deliver parts to my plant on a set schedule?

Yes. ASA operates its own truck fleet across New England and New York, and Auburn offers just-in-time delivery with most orders delivered in 24 to 48 hours. Releases can be scheduled against a blanket order or triggered by kanban signals, and parts can arrive kitted by assembly so they go straight to the line.

Material, processing and fabrication from one supplier

Send a drawing or a material list and the ASA team will quote it from stock.